Grant information


closed    Opened: 30 March 2022   |   Closes: 31 May 2022

Overview

The development of hydrogen powered heavy-duty vehicles (HDV) is key to be able to decarbonise transport of passengers and goods. To achieve this effectively, hydrogen refuelling station (HRS) technologies need to be upgraded to address the refuelling needs of heavy-duty vehicles. The actions described herein will contribute to bring appropriate HDV HRS and HDV HRS components on the market.

Project results are expected to contribute to all of the following expected outcomes:

  • Fully developed and ready to commercialise HRS components (nozzle, hose, cooling unit, safety critical devices, pressure regulator or flow control valve, filters, advanced safety-related communication interface, flow meter etc) meeting the refuelling needs of HDV;
  • Certification of the above-mentioned components according to relevant ISO, OIML or CEN standards. If related standard is still under development, contribution to standard writing in order to ensure components compatibility with future and enable certification in the short term;
  • Demonstration of the fully integrated chain of specific HDV HRS components on at least 2 different HDV HRS for a total of 300 refuelling events each;
  • Full demonstration of new standardised refuelling protocols for heavy-duty vehicle developed in ISO TC 197 WG24 or other standardisation body, as well as approval concept for the conformity of the station to the protocol.

Project results are expected to contribute to all of the following objectives of the Clean Hydrogen JU SRIA (Pillar 2: Hydrogen storage and distribution – Sub-pillar Hydrogen Refuelling Stations:

  • To tackle the technical challenges associated with heavy-duty hydrogen refuelling stations in order to develop a commercial solution that conforms to the heavy-duty requirements;
  • To increase the reliability and availability of Hydrogen Refuelling Stations;
  • To support the creation of a network of Heavy-duty HRS across Europe.

In particular projects results are expected to contribute to the attainment by 2024 of the relevant KPIs identified in the SRIA of the Clean Hydrogen JU including:

  • HRS mean time between failures: 72 hours (700 bar) and 144 hours (350 bar);
  • Annual maintenance cost: 0.5 €/kg (700 bar) and 0.35 €/kg (350 bar);
  • HRS CAPEX(200 – 1000 kg/d): 1,5- 4 k€ / (kg/Day) @ 700 bar and 0.65-2.5 0.35 k€ / (kg/Day) @ 350 bar;

In order to contribute to these KPI, the following additional KPI should be targeted:

  • The target price for the complete refuelling line downstream compressor and storage should be 300 k€ with following components target price for 50-100 unit/year: Nozzle 6 k€; Hose 2 k€; Advanced bidirectional communication interface: 2k€; Break away: 2.5 k€; Flow measuring device: 25 k€; Cooling system: 200 k€; Pressure regulator or flow control valve: 6 k€.

Scope

To fulfil future HDV refuelling needs such as fuelling a 100 kg HD truck storage system in 10 minutes, an HDV refuelling point should reach a mean fuelling rate of approximatively 170 g/s with a peak fuelling rate up to 300 g/s. To guarantee optimal refuelling performances, reliabilities and costs for a wide range of possible HDV storage capacities and configurations, new fuelling protocols based on advanced and safe communication between vehicle and station (e.g. the one developed in ISO TC 197 WG24 based notably on feedback from PRHYDE project[1]) should be implemented. To meet these requirements, proposals should develop, test and certify appropriate components to bring them to commercialisation.

Proposals should address:

  • Qualification of the components:
  • Identify the gaps in terms of standards, market availability and testing;
  • Perform a qualification roadmap individual for each component, with specific targets;
  • At the end of the project, identify potential missing gaps, components, experience to be continued before full market implementation.
  • Qualification of the protocol:
  • Implement the components developed in the qualification program or potential alternatives
  • Define a refueling protocol validation roadmap, accounting for available standards
  • Check that each component performs as expected in a full assembly
  • Validate the protocol on various testing
  • Dissemination of the outcomes;

During the project, those of the following components that are not available on the market should be developed, tested, certified and brought to commercialisation:

  • Nozzle, break away and hose: H70 and H35 very high flow nozzle, break away and hose should be designed for 300 g/s peak flow. A particular attention should be paid to limit pressure drop and heat transfer from the surrounding atmosphere. The project should contribute from the beginning of the project to ISO TC 197/WG5 and WG22 currently working on a new version of ISO 17268 and ISO 19880-5. The components developed should be certified according to previously mentioned standard if published before the end of the project. The feedback on current components drawbacks (size, weight and manoeuvrability, freezing preventing disconnection of nozzle at the end of the refuelling, fragility when dropped, life duration) should be considered.
  • Advanced bidirectional communication interface (HRS and vehicle side): Optimised refuelling protocol able to address a wide range of on-board storage systems and configurations will need an advanced communication interface between vehicles and stations, sufficiently reliable to allow communicated data to be used for safety critical decision in the refuelling protocol. The interface should be developed in collaboration with major European HDV manufacturers. The project should contribute as soon as possible to ISO TC 197 WG24 Task force 2 working on ISO 19885-2 standard on the definition of communications between the vehicle and dispenser control systems.
  • Flow measuring device: The project should develop a flow meter compatible with high flow rate (170 g/s mean flow rate, 300 g/s peak flow, targeting >100kg total mass per refuelling) for H35 and H70. An entire measuring device (including flow meter, calculator etc) ready to be implemented on a dispenser should be developed and certified according to OIML R139.
  • Cooling system: The cooling system should be able to cool hydrogen to obtain a hydrogen temperature at the dispenser of -20°C or below, for a mean fuelling rate of 170 g/s with peak flow of 300 g/s. During design phase the balance between refuelling performance versus the cost (CAPEX and OPEX) of the cooling system should be studied. Particular attention should be paid to reducing the footprint
  • Pressure Regulator or Flow Control Valve: The component should be able to control the pressure ramp rate or the flow appropriately to follow new refuelling protocols and manage corresponding range of flow/pressure variations. A focus should be paid to reaching the needed reliability of valves.
  • Safety critical devices, valve, filter and other components: The project may develop any specific components of the refuelling line downstream compressor and storage that is not available on the market with characteristic suitable for HDV refuelling. Particular attention should be paid to reach sufficient flow coefficient to limit pressure drop throughout the whole system. Special focus should be paid to reach high reliability throughout the fuelling system. Development of efficient and long-life filters to keep contamination and wear to a minimum will be necessary and investigated as during the project.
  • Dispenser: Most of the above-mentioned component should be integrated in a dispenser that should follow ISO 19880-2. The project should also pay attention to propose standardised integration and sizes of the dispenser in a logic of one fit all.

The targeted rated pressure of the developed components should be at least 138% of the nominal working pressure following the recommendation of chapter 8 of ISO 19880-1. The component shall be developed within the first 2.5 years of the project to allow 1.5 years for integration and testing in a full refuelling line assembly.

During the project, a fully integrated component chain from pressure regulator to nozzle and associated control command should be designed and built and should be integrated on at least two HRS having storage and/or compression capability allowing several 100 kg HDV onboard storage per day. A testing phase of at least 6 months under relevant operating conditions should take place during the project. Full experimental set up details and experimental data of the tests should be made publicly accessible at the end of the project.

HRS architecture may be based on direct compression or transfer from high-pressure cascade storage, but these components (compressor and storage) are not the focus of the scope of this action and only a minor share of project funding should be related to storage, compressor and further station adaptations. The control command of these HRS should integrate new HDV refuelling protocols currently under development in ISO TC 197 WG24 or other standardisation bodies. The project should take part as soon as possible to ISO TC 197 WG24 task force 3 working on ISO 19885-3 technical document on new high flow refuelling protocols to better understand these protocols and contribute with feedback on implementation challenges. This project should benefit from the work previously carried out by the PRHYDE[1] project on HDV refuelling protocols.

The project should assess hazard and associated risk of refuelling with the developed fuelling line and should benefit from, but also provide added value compared to the work previously carried out by the MultHyFuel[1] project on the safety considerations for the HRS design.

Applicants are encouraged to involve component manufacturers, HRS manufacturers, HRS operators and heavy-duty vehicle manufacturers.

Activities are expected to start at TRL 3 and achieve TRL 6 by the end of the project.

The conditions related to this topic are provided in the chapter 2.2.3.2 of the Clean Hydrogen JU 2022 Annual Work Plan and in the General Annexes to the Horizon Europe Work Programme 2021–2022 which apply mutatis mutandis.

[1]https://www.clean-hydrogen.europa.eu/projects-repository_en

[2]https://www.clean-hydrogen.europa.eu/projects-repository_en

[3]https://www.clean-hydrogen.europa.eu/projects-repository_en

General Conditions

  1. Admissibility conditions:described inAnnex A and Annex E of the Horizon Europe Work Programme General Annexes

 Proposal page limits and layout: described in Part B of the Application Form available in the Submission System

 Additional condition: For all Innovation Actions the page limit of the applications are 70 pages.

  1. Eligible countries:described inAnnex B of the Work Programme General Annexes

A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.

 

  1.  Other eligibility conditions:described in Annex B of the Work Programme General Annexes

Additional eligibility condition: Maximum contribution per topic

For some topics, in line with the Clean Hydrogen JU SRIA, an additional eligibility criterion has been introduced to limit the Clean Hydrogen JU requested contribution mostly for actions performed at high TRL level, including demonstration in real operation environment and with important involvement from industrial stakeholders and/or end users such as public authorities. Such actions are expected to leverage co-funding as commitment from stakeholders. It is of added value that such leverage is shown through the private investment in these specific topics. Therefore, proposals requesting contributions above the amounts specified per each topic below will not be evaluated:

- HORIZON-JTI-CLEANH2-2022-01-07 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 9.00 million

- HORIZON-JTI-CLEANH2-2022-03-03 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 30.00 million

- HORIZON-JTI-CLEANH2-2022-03-05 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 15.00 million

- HORIZON-JTI-CLEANH2-2022-04-01 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 7.00 million

- HORIZON-JTI-CLEANH2-2022-06-01 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 25.00 million

- HORIZON-JTI-CLEANH2-2022-06-02 - The maximum Clean Hydrogen JU contribution that may be requested is EUR 8.00 million

 Additional eligibility condition: Membership to Hydrogen Europe/Hydrogen Europe Research

For some topics, in line with the Clean Hydrogen JU SRIA, an additional eligibility criterion has been introduced to ensure that one partner in the consortium is a member of either Hydrogen Europe or Hydrogen Europe Research. This concerns topics targeting actions for large-scale demonstrations, flagship projects and strategic research actions, where the industrial and research partners of the Clean Hydrogen JU are considered to play a key role in accelerating the commercialisation of hydrogen technologies by being closely linked to the Clean Hydrogen JU constituency, which could further ensure full alignment with the Strategic Research and Innovation Agenda of the Industry and the SRIA188 of the JU. This approach shall also ensure the continuity of the work performed within projects funded through the H2020 and FP7, by building up on their experience and consolidating the EU value-chain. This applies to the following topics: 

- HORIZON-JTI-CLEANH2-2022 -01-07

- HORIZON-JTI-CLEANH2-2022 -01-08

- HORIZON-JTI-CLEANH2-2022 -01-10

- HORIZON-JTI-CLEANH2-2022 -02-08

- HORIZON-JTI-CLEANH2-2022 -03-03

- HORIZON-JTI-CLEANH2-2022 -03-05

- HORIZON-JTI-CLEANH2-2022 -04-01

- HORIZON-JTI-CLEANH2-2022 -06-01

- HORIZON-JTI-CLEANH2-2022 -06-02

 - HORIZON-JTI-CLEANH2-2022 -07-01

 Additional eligibility condition: Participation of African countries

For one topic the following additional eligibility criteria have been introduced to allow African countries to i) participate in proposal, ii) be eligible for funding and iii) ensure a sufficient geographical coverage of the African continent. This concerns the following topic: 

- HORIZON-JTI-CLEANH2-2022 -05-5

Manufacturing Readiness Assessment

For some topics a definition of Manufacturing Readiness Level has been introduced in the Annexes of the Annual Work Programme. This is necessary to evaluate the status of the overall manufacturing activities included in the following topics:

- HORIZON-JTI-CLEANH2-2022 -01-04

- HORIZON-JTI-CLEANH2-2022 -04-01

  1. Financial and operational capacity and exclusion:described in Annex C of the Work Programme General Annexes
  2. Evaluation and award:
  • Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
  • Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manua

Exemption to evaluation procedure: complementarity of projects

For some topics in order to ensure a balanced portfolio covering complementary approaches, grants will be awarded to applications not only in order of ranking but at least also to one additional project that is / are complementary, provided that the applications attain all thresholds

- HORIZON-JTI-CLEANH2-2022 -01-03

- HORIZON-JTI-CLEANH2-2022 -01-04

- HORIZON-JTI-CLEANH2-2022 -01-09

- HORIZON-JTI-CLEANH2-2022 -02-10

- HORIZON-JTI-CLEANH2-2022 -03-01

- HORIZON-JTI-CLEANH2-2022 -03-02

- HORIZON-JTI-CLEANH2-2022 -03-04

- HORIZON-JTI-CLEANH2-2022 -04-04

Seal of Excellence

For two topics the ‘Seal of Excellence’ will be awarded to applications exceeding all of the evaluation thresholds set out in this Annual Work Programme but cannot be funded due to lack of budget available to the call. This will further improve the chances of good proposals, otherwise not selected, to find alternative funding in other Union programmes, including those managed by national or regional Managing Authorities. With prior authorisation from the applicant, the Clean Hydrogen JU may share information concerning the proposal and the evaluation with interested financing authorities, subject to the conclusion of confidentiality agreements. In this Annual Work Programme ‘Seal of Excellence’ will be piloted for topics:

- HORIZON-JTI-CLEANH2-2022 -06-01

- HORIZON-JTI-CLEANH2-2022 -06-02

  • Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
  1. Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes

In addition to the standard provisions, the following specific provisions in the model grant agreement will apply:

Intellectual Property Rights (IPR), background and results, access rights and rights of use (article 16 and Annex 5 of the Model Grant Agreement (MGA)).

  • An additional information obligation has been introduced for topics including standardisation activities: ‘Beneficiaries must, up to 4 years after the end of the action, inform the granting authority if the results could reasonably be expected to contribute to European or international standards’. These concerns the topics below:

Additional information obligation for topics including standardisation activities

- HORIZON-JTI-CLEANH2-2022 -02-09

- HORIZON-JTI-CLEANH2-2022 -03-04

- HORIZON-JTI-CLEANH2-2022 -05-02

- HORIZON-JTI-CLEANH2-2022 -05-03

- HORIZON-JTI-CLEANH2-2022 -05-04

  • For all topics in this Work Programme Clean Hydrogen JU shall have the right to object to transfers of ownership of results, or to grants of an exclusive licence regarding results, if: (a) the beneficiaries which generated the results have received Union funding; (b) the transfer or licensing is to a legal entity established in a non-associated third country; and (c) the transfer or licensing is not in line with Union interests. The grant agreement shall contain a provision in this respect.

Full capitalised costs for purchases of equipment, infrastructure or other assets purchased specifically for the action

For some topics, in line with the Clean Hydrogen JU SRIA, mostly large-scale demonstrators or flagship projects specific equipment, infrastructure or other assets purchased specifically for the action (or developed as part of the action tasks) can exceptionally be declared as full capitalised costs. This concerns the topics below:

- HORIZON-JTI-CLEANH2-2022 -01-07: electrolyser and other hydrogen related equipment essential for implementation of the project, (e.g. compression of hydrogen, storage and any essential end-use technology)

- HORIZON-JTI-CLEANH2-2022 -01-08: electrolyser, its BoP and any other hydrogen related equipment essential for the implementation of the project (e.g. hydrogen storage)

- HORIZON-JTI-CLEANH2-2022 -01-10: electrolyser, its BOP and any other hydrogen related equipment essential for implementation of the project (e.g. offshore infrastructure, renewable electricity supply infrastructure, storages, pipelines and other auxiliaries required to convey and utilise the hydrogen)

- HORIZON-JTI-CLEANH2-2022 -02-08: compression prototype/s and related components

- HORIZON-JTI-CLEANH2-2022 -03-03: trucks, fuel cell system, on-board hydrogen storage and other components needed in a hydrogen truck

- HORIZON-JTI-CLEANH2-2022 -03-05: vessels, fuel cell system, on-board hydrogen storage and other components needed in a hydrogen fuel cell hydrogen vessel

- HORIZON-JTI-CLEANH2-2022 -04-01: manufacturing equipment and tooling

- HORIZON-JTI-CLEANH2-2022 -06-01: hydrogen production plant, distribution and storage infrastructure and hydrogen end-uses

- HORIZON-JTI-CLEANH2-2022 -06-02: hydrogen production plant, distribution and storage infrastructure and hydrogen end-uses

Specific conditions

  1. Specific conditions:described in thechapter 2.2.3.2 of the Clean Hydrogen JU 2022 Annual Work Plan

Documents

Call documents:

Application form — As well available in the Submission System from March 31st 2022

Application form - Part B (HE CleanH2 RIA, IA)

Application form - Part B (HE CleanH2 CSA)

 Evaluation forms

Evaluation form (HE RIA, IA)

Evaluation form (HE CSA)

 Model Grant Agreement (MGA)

HE General MGA v1.0  

 Clean Hydrogen JU - Annual Work Programme 2022 (AWP 2022)

AWP 2022

 Clean Hydrogen JU - Strategic Research and Innovation Agenda (SRIA) 

SRIA - Clean Hydrogen JU 

Additional documents:

HE Main Work Programme 2021–2022 – 1. General Introduction

HE Main Work Programme 2021–2022 – 13. General Annexes

HE Programme Guide

HE Framework Programme and Rules for Participation Regulation 2021/695

HE Specific Programme Decision 2021/764

EU Financial Regulation

Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment

EU Grants AGA — Annotated Model Grant Agreement

Funding & Tenders Portal Online Manual

Funding & Tenders Portal Terms and Conditions

Funding & Tenders Portal Privacy Statement

MORE EUROPEAN UNION GRANTS

Increase ROI Abroad with Global Incentives

Learn how your business can reduce your costs of doing business internationally and improve your return on investment.

Read Guide
global-incentives-dropsheet@1x
HubSpot Video
When we went through our first year with CTI we had an 89% completion rate, to me that’s unheard of...their team is dedicated to working with us and they are trying to maximize your tax credits.
Jay Ramos, President of Amtec